Preferred Route (Location) Report
Capital Works Management Framework, Guidance Note, Glossary, Published by the Government of Ireland Department of Finance in 2009 suggests that: ‘The Preferred Route (Location) Report assesses the location or preferred route of a civil engineering project, and may include preliminary design studies dealing with basic layout, point of discharge, assimilative capacity, site coverage (footprint and facility), block plan options to determine best land use, planning considerations and overall cost implications. The use of mapping and GIS systems can be particularly useful in helping to the required information quickly and economically.’
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.
National Scheme of Delegation introduced.
The cost of employing people remains a concern.
Code of Practice for Electrical Energy Storage Systems.
ECA calls on members to comment on draft 4th edition.
Bringing together expertise and creating cultural benefits.
CIOB celebrates positive Ofsted report.
The Building Safety Regulator announces a call for evidence.
















